top of page
Nexus GC header image.webp

Our Projects

Welcome to our Projects page, where innovation meets execution. Explore our diverse range of completed projects that showcase our commitment to quality and creativity. Each project reflects our dedication excellence and the unique solutions we provide to our clients..

1-project-wave-berlin-residential-building-a.webp
1. Project Reference
Wave Berlin / Residential Building
Project: Wave Berlin / New construction
Building owner: Bauwerk Stralauer Allee GmbH & Co. KG
Client: LeitWerk AG
Position: Projectmanager
Project duration: 12/16 – 03/18 last concrete
Personal care duration: ab dem 1.OG, 11/17 – 04/18
Gross floor area: 16.000 m²
Trades:
Complete shell construction work, masonry work, earthworks, electrical conduit, interior plastering and filling work, waterproofing work, underground garage insulation.
1-project-wave-berlin-residential-building-b.webp
1-project-wave-berlin-residential-building-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
2. Project Reference
FÜRST Berlin / Residential, Shopping Center & Office Building
Project: FÜRST Berlin / Building in existing and new construction
Building owner: CELLS Group
Client: CELLS Group
Position: Project manager
Project duration: 05/18 – 12/22
Personal care duration: 05/18 – 10/18
Gross floor area: 60.000 m²
Trade:
Shell construction work, masonry work, complex demolition work, production of more than 20,000 subsequent reinforcement
connections, repair work, renovation work, sealing work.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
Project Images_0000_Project 3.webp
3. Project Reference
Sedelhöfe Ulm / Residential, shopping center & office building

Project: Sedelhöfe Ulm / New Building
Building owner: DC Developments GmbH & Co. KG
Client: Projekt SPV 11 GmbH
Position: Site manager
Project duration: 03/18 – 09/19 last concrete
Personal care duration: 10/18 – 04/19
Gross floor area: 77.500 m²
Trade:
Complete shell construction work, coordination and acceptance
of the reinforcement work.

Project Images_0002_Project 3 b.webp
Project Images_0001_Project 3 c.webp
Project Images_0054_Project 4 a.webp
4. Project Reference
SÖPP BMG Mauerstraße Berlin / Federal Ministry of Health
Project: OPP BMG Mauerstra§e Berlin / New and existing buildings
Project subdivision:
• Mauerstraße Weiße Wanne house 1
• Mauerstraße Weiße Wanne house 2
• Mauerstraße Neubau Innenhof house 1
• Mauerstraße Blasting shaft and shaft group
Building owner: Bundesanstalt für Immobilienaufgaben
Direkton
Berlin Client: ARGE ÖPP BMG Berlin / BAM Deutschland
AG - HOCHTIEF
Position: Projectmanager / Senior Sitemanager
Project duration: 09/18 – 09/20
Personal care duration: 04/19 – 09/20
Gross floor area: 65.000 m²
Trades:
Complete shell construction work, reinforcement work, construction in existing buildings, masonry work, demolition work, sealing work, earthworks, repair work, renovation work.
Project Images_0053_Project 4 b.webp
Project Images_0052_Project 4 c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
5. Project Reference
Quartier Heidestraße Berlin / Residential & office building
Project: Quartier Heidestra§e Berlin / New Building
Building owner: Quartier Heidestraße GmbH
Client: KOHA Immobilien und Bauausführungen GmbH Projektleitung
Position: Project manager
Project duration: 07/18 – 09/19 last concrete
Personal care duration: 04/19 – 02/20
Gross floor area: 53.000 m²
Trades:Entire shell construction work, reinforcement work, waterproofing work (waterproof construction), masonry work.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
6. Project Reference
Pappelallee Berlin / Living and shopping
Project: Pappelallee Berlin / New Building
Building owner: Trei Real Estate Pappelallee GmbH
Client: S.Pötnger GmbH & Co. KG Bauunternehmung
Position: Projectmanager
Project duration: 11/18 – 07/20 letzter Beton
Personal care duration: 04/19 – 10/20
Gross floor area: 20.000 m²
Trades:
Complete shell construction work, reinforcement work, masonry work, waterproofing work (waterproof construction), underground garage insulation.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
7. Project Reference
Voltaire Berlin / Office Building
Project: Voltaire Berlin / New Building
Building owner: ABG REAL ESTATE GROUP
Client: KOHA Immobilien und Bauausführungen GmbH
Position: Projectmanager / Sitemanager
Project duration: 9/19 – 09/20 last concrete
Personal care duration: 09/19 – 10/20
Gross floor area: 31.000 m²
Trades:
Entire shell construction work, reinforcement work, masonry work, waterproofing work (waterproof construction), underground garage insulation, earthworks, electrical conduit work.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
8. Project Reference
SKAI Strandkai Hamburg / Residential & office building
Project: SKAI Strandkai Hamburg / New Building
Building owner: Strandkai Konsortium AUG. PRIEN Immobilien
Gesellschaft für Projektentwicklung mbH
Client: KOHA Immobilien und Bauausführungen GmbH
Position: Projectmanager
Project duration: 07/20 – 10/21
Personal care duration: 07/20 – 10/21
Gross floor area: 65.000 m²
Trades:
Entire shell construction work (formwork and concrete work only), waterproofing work (waterproof construction).
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
9. Project Reference
Überseequartier Hamburg / Residential & Retail
Project: Uberseequartier Hamburg / New Building
Project subdivision:
• ÜSQ Los 3, BF-Nord-B
• ÜSQ Los 4, BF-Nord-A
Building owner: UNIBAIL-RODAMCO-WESTFIELD
Client: BAM Deutschland AG
Position: Projectmanager / Senior Sitemanager
Project duration: 07/20 – 02/22 last concrete
Personal care duration: 07/20 – 02/22
Gross floor area: 50.000 m²
Trades:
Entire shell construction work, reinforcement work, steel construction work, waterproofing work (waterproof construction).
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
10. Project Reference
Quartier Heidestrasse Straight & Colonnades
Berlin
/ Residential & Office Building
Project: Quartier Heidestrasse Straight & Colonnades Berlin / New B.
Building owner: Quartier Heidestraße GmbH
Client: KOHA Immobilien und Bauausführungen GmbH
Position: Projectmanagement (pure invoicing, auditing
and monthly site inspection with client epresentative and BG Bau)
Project duration: 11/20 – 10/21 letzter Beton
Personal care duration: 11/20 – 10/21
Gross floor area: 62.000 m2
Trades: Structural work, brickwork
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
11. Project Reference
Überseequartier Hamburg / Office Building and Hotel
Project: Uberseequartier Hamburg / New Building
Project subdivision:
• ÜSQ BF-F3
• ÜSQ BF-F4
• ÜSQ BF-D2
Building owner: UNIBAIL-RODAMCO-WESTFIELD
Client: Zech Hochbau AG
Position: CEO / Projectmanager
Project duration: 10/21 – 03/22
Personal care duration: 10/21 – 03/22
Gross floor area: 10.000 m²
Trades: Reinforcement and maintenance work
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
12. Project Reference
Überseequartier Hamburg / Office Building
Project: Uberseequartier Hamburg / New Building
Project subdivision: ÜSQ BF-D1
Building owner: UNIBAIL-RODAMCO-WESTFIELD
Client: Zech Hochbau AG
Position: CEO / Projectmanager
Project duration: 12/21 – 04/22 last concrete
Personal care duration: 12/21 – 05/22
Gross floor area: 5.500 m²
Trades:
Entire shell construction work, reinforcement work, steel construction work Waterproofing work (waterproof construction).
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
13. Project Reference
Bildungszentrum Fruerlund / School Building
Project: Bildungszentrum Fruerlund / New elementary school building
Building owner: City Flensburg, Germany
Client: HC HAGEMANN GmbH & Co. KG
Position: CEO / Sitemanager
Project duration: 04/22 – 08/22
Personal care duration: 04/22 – 08/22
Gross floor area: 5.600 m²
Trades:
Entire shell construction work, reinforcement work, masonry work, steel construction work, earthworks, waterproofing work.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
14. Project Reference
Überseequartier Hamburg / Cinema
Project: Uberseequartier Hamburg / New Building
Project subdivision: ÜSQ BF-F2
Building owner: UNIBAIL-RODAMCO-WESTFIELD
Client: UNIBAIL-RODAMCO-WESTFIELD
Position: Projectmanager / Senior Sitemanager
Project duration: 07/22 – 04/23
Personal care duration: 08/22 – 04/23
Gross floor area: 18.000m²
Trades:
gall shell construction work, reinforcement work, MW work,
steel construction work.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
15. Project Reference
Überseequartier Hamburg / Cinema
Project: Uberseequartier Hamburg / New Building
Project subdivision: ÜSQ BF-F5
Building owner: UNIBAIL-RODAMCO-WESTFIELD
Client: UNIBAIL-RODAMCO-WESTFIELD
Position: Projectmanager / Senior Sitemanager
Project duration: 07/22 – 05/23
Personal care duration: 08/22 – 05/23
Gross floor area: 25.000m²
Trades:
Entire shell construction work, reinforcement work, steel construction work Waterproofing work (waterproof construction).
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
16. Project Reference
TDDK Bernsdorf Phase 6 / Production Facility
Project: TDDK Bernsdorf Phase 6 / New Building
Project subdivision: TDDK Phase 6
Building owner: TD Deutsche Klimakompressor GmbH
(Tochterg. v. TOYOTA)
Client:
TAKENAKA EUROPE GMBH
Position: Projectmanager / Sitemanager
Project duration: 06/23 – Current project
Personal care duration: 06/22 – Current project
Gross floor area: 36.000m²
Trades:
Turnkey: earthworks, groundwork, waterproofing, structural work, building services, façade and roof work, FT hall construction and much more.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
17. Project Reference
Estrel Tower Berlin / Hotel and Office tower with Atrium, Foyer and Restaurant
Project: Estrel Tower Berlin (Germany Tallest building)
Building owner: Estrel Tower Besitz GmbH & Co. KG (Ekkehard Streletzki)
Client:
REKALIU GmbH
Position: Projectmanagement (for invoicing and supplement manag.)
Project duration: 04/22 – Current project
Personal care duration: 08/23 – 03/24
Gross floor area: 75.000m² (2 Unterg. und 45 Oberg. und. gesamt
176m Hoch)
Trades:
Structural work, steel construction work, waterproofing work
(waterproof construction).
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
18. Project Reference
Werk 3.10, Lack4 / Hall extension of painting volume in motorcycle production
Project: Werk 3.10, Lack4 Berlin Spandau
Building owner: BMW AG - Bayerische Motoren Werke
Aktiengesellschaft
Client: Bayluk Industrielle Dach- und Fassadentechnik GmbH
Position: Sitemanager
Project duration: 08/24 – Current project
Personal care duration: 08/24 – Current project
Gross floor area: Roof: 2.500m²; Facade 4.000m²
Trades:
Roof and facade, steel construction, demolition/dismantling, smoke and heat extraction system, drainage, metal construction work, roof waterproofing work, and much more.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
19. Project Reference
Mars Viersen / Hall extension & edevelopment, silo enclosure
Project: Mars Viersen
Building owner: Mars Wrigley, Viersen
Client: TAKENAKA EUROPE GMBH
Position: Sitemanager
Project duration: 02/24 – Current project
Personal care duration: 01/25 – Current project
Gross floor area: 5.000m²
Trades:
Turnkey construction: earthworks, demolition work, roof and facade construction, fire protection technology support, steel construction, painting works, technical building equipment installation, shell and interior construction, and much more.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
20. Project Reference
Central Clinic Georgsheil / New Construction
Project: Central Clinic Georgsheil / new construction
Building owner: Trägergesellschaft Kliniken Aurich-Emden-Norden mbH
Client:
LEONHARD WEISS GmbH & Co. KG
Position: Project Manager
Project duration: Since 2022 – expected completion 2028
Personal care duration: 08/25 – Current project
Gross floor area: Approximately 115,000 m²
Trades:
All shell construction work managed, coordinated, and executed by us, including white waterproofing and implementation of the WU-concept with installation of fresh composite membranes, reinforcement work, masonry, crane operations, formwork, and water management.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
21. Project Reference
Kühllager Bünting, Nortmoor / New Construction
Project: Kühllager Bünting, Nortmoor / new construction
Building owner: Bünting Unternehmensgruppe
Client: Goldbeck Nord GmbH
Position: Site Manager
Project duration: 2024 - 2027 (Planned start and operation)
Personal care duration: 10/25 – Current project
Gross floor area: Approx. 6,500 m²
Trades:
Turnkey construction including Execution of Rüttelstopf Säulenverfahren (vibro-flotation column method) for soil improvement, earthworks, demolition, roofing and facade works, installation of fire protection systems, steel construction, painting, installation of technical building equipment, shell and interior construction, integration of automated shuttle warehousing system, and advanced cooling technology operating between 0 and 2 °C.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
2-project-furst Berlin Residential Shopping Center-a.webp
22. Project Reference
Kingdom of Arabian Horses - SAHEEL / New Construction
Project: Kingdom of Arabian Horses - SAHEEL
Reference: Mixed-Use Equestrian Destination in KAEC
Project owner: GloVentures Investments Holding
Project duration: 2026 – expected completion 2031
Project area: Approximately 2 million m²
Trades:
The Kingdom of Arabian Horses is a landmark mixed-use development in KAEC, master planned to celebrate Saudi Arabia’s equestrian heritage through a global and national events calendar, while delivering premium residential, hospitality, retail, and leisure spaces.
2-project-furst Berlin Residential Shopping Center-b.webp
2-project-furst Berlin Residential Shopping Center-c.webp
bottom of page